工程概況 Project Overview:’項目名稱: TDI聯(lián)合裝置廠區(qū)中壓電纜敷設(shè)施工。Project name: TDI Train Plant Medium Voltage Cable Pulling Work.本工程涉及三個變電站,分別是現(xiàn)有的220/35kV A472變電站、現(xiàn)有35/10kV B301S變電站以及新建的35/10kV C581變電站,工作內(nèi)容為三個變電站之間和從三個變電站接至MV用戶的電力電纜、控制電纜、接地電纜的敷設(shè)。The project involves three substations, namely the existing 220/35kV A472 substation, the existing 35/10kV B301S the 35/10kV C581 substation and a new substation. This is the power, control and grounding cable pulling among three substations and for MV users connected to the three substations.