(圖紙、施工組織、計(jì)算書、任務(wù)書、指導(dǎo)書)
某市擬建高層住宅樓總建筑面積6021m2;。主體結(jié)構(gòu)9層。底層層高4.2m;2-9層層高為3.0 m,房屋總高28.2m。結(jié)構(gòu)形式采用框架結(jié)構(gòu)。柱截面尺寸為600×600mm。橫向框架梁截面尺寸250×450mm,縱向框架梁截面尺寸300×500mm。室內(nèi)外高差為0.45m。結(jié)構(gòu)設(shè)防烈度為7度,抗震等級(jí)為Ⅱ級(jí);A(chǔ)采用柱下獨(dú)立基礎(chǔ),基礎(chǔ)埋深2.2m。
本工程建筑功能為公共建筑,使用年限50年,耐火等級(jí)為一級(jí)。內(nèi)墻體材料為填充墻,采用200厚蒸壓加氣混凝土砌塊,外墻采用燒結(jié)普通空隙粘土磚,240mm厚。外墻裝修使用仿石材外墻涂料,室外臺(tái)階為水泥臺(tái)階,表面鋪大理石,散水為細(xì)石混凝土散水;室內(nèi)墻面主要是噴涂乳膠漆,室內(nèi)地面的裝修做法有:大理石地面,防滑地磚地面,實(shí)木地板地面,室內(nèi)頂棚主要采用石棉吸音板;門窗采用塑鋼窗和裝飾木門;全樓設(shè)電梯一部和樓梯一部;地下防水為卷材防水;屋面為膨脹珍珠巖保溫、卷材防水屋面;衛(wèi)生間為聚氨酯涂膜防水。
1目 錄
一、編制依據(jù)及編制說明 ·······································1
1.1編制依據(jù) ·················································1
1.2編制說明 ·················································2
1.3編制原則與要求 ··········································2
二、工程概況及特點(diǎn)分析 ·········································3
2.1工程建設(shè)概況 ·············································3
2.2 工程設(shè)計(jì)概況··············································3
2.3主要分項(xiàng)工程的工程量 ·····································4
2.4 建設(shè)地點(diǎn)的特征 ··········································4
2.5 施工條件 ················································4
2.6特點(diǎn)分析··················································4
三、施 工 部 署··················································5
3.1 施工管理機(jī)構(gòu) ·············································5
3.2施工任務(wù)··················································6
3.3 各分部工程的展開程序······································6
3.4 施工現(xiàn)場(chǎng)平面布置···············································7
3.5施工準(zhǔn)備工作計(jì)劃· ········································8
四、主要分部分項(xiàng)工程施工方法··································13
4.1 工程測(cè)量······················································13
4.2 場(chǎng)地平整·················································14
4.3 防水工程 ················································15
4.4 結(jié)構(gòu)工程·················································21
4.5 屋面工程· ··············································33
4.6 裝飾工程·················································37
4.7 粉飾工程 ··············································56
五、主要施工保證措施···········································61
5.1 工期保證措施 ············································61
5.2 質(zhì)量保證措施············································62
5.3 文明現(xiàn)場(chǎng)保證措施········································71
5.4 環(huán)境保護(hù)措施············································79
5.5 雨季施工保證措施········································80
結(jié)束語 ·······················································83